top of page

Renergen Challenges SSPP's Breach of Helium Production Rights

  • AKAP
  • Dec 13, 2024
  • 8 min read

Renergen raised concerns over Springbok Solar Power Plant (SSPP) commencing construction without obtaining the required Section 53 consent in an area covered by Renergen’s valid petroleum production right, held since 2012. Under the newly enacted Upstream Petroleum and Resources Development Act, helium is classified as an associated gas of petroleum, reinforcing Renergen’s claim that its rights extend to helium extraction within the disputed area.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page