top of page

US BLM Helium Facility Goes Down Again

The US BLM's Cliffside plant went down again last week leading to a halt in helium production. The pipeline pressure was 1287PSIG and the offtakers were under allocation as a result of the outage. The K-100 unit which puts gas through the coolbox went down due to an issue with the heat sensors. It appears to be a relatively easy problem to rectify with a restart being attempted over the last weekend meaning production should be back up and running this week.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page