top of page

Royal Helium Receives Permits for Climax-4 Helium Well

Royal Helium Ltd reported that it received the necessary permits to drill its Climax-4 helium well in Saskatchewan and that it scheduled a spud date of August 7, 2021. This fourth helium well, which is designed as a production offset to its Climax-3 well, is being drilled in order to target the new Regolith helium discovery zone with the goal of producing helium found in the formations. The drilling will last for 14 days, reaching a total depth of 2,700m.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All

US Energy Delves into Kevin Dome Exploration Plans

On an analyst call, US Energy Corp management talked about its plans for its recently acquired Montana helium asset. The asset is situated on a greater than 100-mile anticline structure known for its

Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page