New Era Begins Infrastructure Overhaul at Pecos Slope Field
Apr 28, 2025
3 min read
New Era Helium will commence an infrastructure buildout in the Pecos Slope Field by mid-May'25, replacing outdated 1980s-era gathering systems responsible for ~25% gas losses and methane emissions.