top of page

Grand Gulf's Jesse-2 Helium Well to Spud in March

  • AKAP
  • Feb 27, 2023
  • 5 min read

Grand Gulf Energy's Jesse-2 helium appraisal well is scheduled for mid-March and all long lead items have been purchased. The well is 1.5 miles SE of the Jesse-1A discovery well and within the same structure, which intersected a >200ft gas column and returned 1% helium to surface. Aztec Well Servicing has been contracted to drill the well. Jesse-2 will exclusively target the gas zones discovered in Jesse-1A, and has been selected as the best of three mature prioritised locations on the Jesse structure. The program will include managed pressure drilling and will terminate at least 50 feet above the gas/water contact.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page