Gold Hydrogen reported progress during Q2'24 at its Ramsay Project on the Yorke Peninsula, South Australia with initial exploration well testing confirming the presence of natural hydrogen and helium at surface levels. Post-quarter, Stage 2 testing commenced, focusing on lifting formation water to facilitate gas flow. Additionally, a 570 km 2D seismic survey by Terrex was completed, which, alongside well testing results, will aid in optimising future drilling locations and designs.
top of page
Search
Recent Posts
See AllPulsar Helium closed a £1.125mm (US$1.5mm) cornerstone investment as part of its planned £5mm IPO on London’s AIM , targeted for Oct'24....
Avanti Helium closed the first tranche of its private placement, raising C$300k by issuing 1.2mm units at C$0.25/unit. Each unit consists...
© 2024 AKAP ENERGY LTD. | REGISTERED IN ENGLAND: 11135737 | 03333 446 360 | INFO@AKAPENERGY.COM
bottom of page
Comments