top of page

Georgina Energy Revises 2U He to 234bcf (+37.8% from Previous) at Mt Winter

  • AKAP
  • Jul 9, 2025
  • 3 min read

Georgina Energy reported a 37.8% increase in net attributable 2U Prospective Recoverable Resources at the Mt Winter prospect (EPA155, Amadeus Basin, NT) following an independent geological report assessing fracture porosity in the Heavitree Formation and basement granodiorite.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
Helium One Begins ESP Testing

Helium One began electrical submersible pump (ESP) testing at the Itumbula West-1 (ITW-1) well in its Southern Rukwa Helium Project, Tanzania.

 
 
bottom of page