top of page

Gazprom claims Linde’s design error caused Amur accident

  • AKAP
  • Nov 26
  • 1 min read

In a November 2025 presentation by Oleg Olegovich Podsviryov at Gazprom displayed on LinkedIn, the operator of the Amur Gas‑Processing Plant (GPP) disclosed that the helium cryogenic trains are supplied via a dedicated separation module — Unit X-40 — which extracts a nitrogen-helium mixture from the main cryogenic flow for subsequent helium purification and liquefaction.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page