D3 Energy’s Q2’25 Results; RBD10 Sees 39% Increase in Flow Rate
Jul 28, 2025
2 min read
D3 Energy highlighted two major technical milestones in Q2 2025 at its ER315 helium-methane project in South Africa and new strategic acreage in Australia.
Want to read more?
Subscribe to akapenergy.com to keep reading this exclusive post.
Pulsar Helium intersected a pressurised gas zone at its Jetstream #7 appraisal well at the Topaz Project, confirming a pressurised helium system at a depth of ~2,107 feet (642m) with a bottom-hole pre