top of page

D3 Energy Reports Strong Helium Flow Rates at RBD10; Prepares for RBD12 Drilling

  • Aug 28, 2024
  • 3 min read

D3 Energy completed production testing of its RBD10 well at ER315 in Free State, South Africa with a relatively high flow rate of 191mcf/d over 14 days—an increase from the previous record of 126mcf/d from the same well. The gas composition at RBD10 includes 4.7% helium and 87.7% methane. The well is now shut in for reservoir pressure buildup before further testing. The company will now begin drilling at the nearby RBD12 well, budgeted to cost ~A$200k (~US$135k) to drill and complete which is similar to Renergen's cost profile for its Phase-1 development wells. The company also retracted two immaterial statements from its latest investor presentation.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
Renergen Begins Commercial Liquid Helium Production

After numerous delays, Renergen has finally commenced production of liquid helium from its Virginia Gas Project in South Africa. The company is now accumulating inventory for customer deliveries sched

 
 
bottom of page