top of page

D3 Energy Commences Production Testing at RBD03 in South Africa

D3 Energy began production testing at the gold exploration borehole RBD03 for helium and natural gas, located within ER315, South Africa, drilled in 1982. This testing is part of an extended multi-borehole programme, including the historical RBD01 borehole, aimed at determining well interference and spacing. The results will expedite the submission of a Production Right application to South African authorities. Custom metering equipment, designed in Australia, is being used for the tests, expected to last two weeks. Additionally, drilling at the nearby RBD12 well will commence post-testing, aiming to validate the geological model and potentially yield commercial gas production rates.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All

Comentarios


Los comentarios se han desactivado.
bottom of page