D3 Energy commenced production testing at its RBD10 well in the Free State, South Africa, following the success of the RBD03 test, which demonstrated a flow rate of 147mcf/d of raw gas. The new test at RBD10 aims to replicate or exceed these results, utilising specialised metering equipment designed to meet stringent standards. The testing phase, expected to last 14 days, is part of a broader programme that will guide the company's future drilling and testing strategies within ER315, as well as the preparation for a Production Right application to South African authorities.
top of page
Search
Recent Posts
See AllIn an episode of the Rock Yarns podcast, host Peter Strachan discusses D3 Energy's ongoing projects with David Casey, the company's CEO....
bottom of page
Comments