Blue Star Helium's State 16 SWSE 3054 development well at its Galactica helium project in Las Animas County, Colorado has been successfully drilled to its final total depth. The well encountered the Lyons formation at 1,111.5 feet and was completed at 1,211 feet. No water was encountered during drilling. Wireline logs show approximately 96 feet of high-quality, gas-saturated sands in the upper Lyons production section. The well flowed naturally during drilling and has been “cleaning-up” with elevated helium readings. It is about to commence a pressure gradient test, flow testing, sampling, and a pressure build-up test over five days.
top of page
Search
Recent Posts
See AllIn a recent social media post, Blue Star Helium shared a video showing that the preparations to drill the State 16 development well at...
bottom of page
Comments