HIMOINSA Provides Temporary Power for Renergen's SA Project
- AKAP
- Dec 14, 2022
- 1 min read
HIMOINSA Southern Africa has supplied rental equipment with 8MW of prime power for Renergen's LNG and helium plant in Free State. During the construction process, no electrical connection was available, necessitating Renergen to proceed with a self-build electrical connection to the Eskom grid infrastructure and, in the interim, ensure they had a temporary, prime power solution to ensure timely commissioning of the Phase 1 Virginia gas Project.