Thor Completes 2D Seismic at HY-Range
- AKAP
- Dec 18
- 6 min read
Thor Energy reported progress at its HY-Range Project (RSEL 802) in South Australia, with line layouts completed for a major 2D seismic survey scheduled for mid-2026 and exploration drilling targeted thereafter.