top of page

Helium One Advances at its Rukwa Project with ESIA Study

Helium One is moving forward with Phase III of its Rukwa Project in Tanzania, initiating an Environmental and Social Impact Assessment (ESIA) as part of a feasibility study for converting its Prospecting Licences to Mining Licences. The company has engaged MTL Consulting Ltd for the ESIA and is also conducting subsurface work to establish contingent resource estimates. Alongside, it has begun engineering studies for a production facility, exploring options for a pilot plant and scalable modular systems for helium liquefaction, storage, and transportation. Preparations for the Extended Well Test at Itumbula West-1 are underway, with the company evaluating the potential of re-entering the Tai-3 well or drilling a new well.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All

US Energy Delves into Kevin Dome Exploration Plans

On an analyst call, US Energy Corp management talked about its plans for its recently acquired Montana helium asset. The asset is situated on a greater than 100-mile anticline structure known for its

bottom of page