top of page

D3 Reports Reduced Flow Rate at RBD12 Test

  • Dec 2, 2024
  • 3 min read

Updated: Dec 5, 2024

D3 Energy's production testing at RBD12 in ER315, South Africa, revealed reduced initial gas flow rates due to wellbore damage, with analysis indicating a high skin factor inhibiting gas flow, which implies that reservoir permeability near the wellbore is obstructed.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
QIMC Records 24.3% Hydrogen at Bennett Hill

Quebec Innovative Materials Corp (QIMC) reported final mud-gas results from DDH-26-04 at Bennett Hill, Nova Scotia, with a peak natural hydrogen reading of 24.3% H₂ at 707 m and evidence supporting a

 
 
bottom of page