top of page

US BLM: Multiple Issues Preventing Restart

The notes from the last meeting on 15th March show that the line pressure is below the critical level of 600PSIG. There are mechanical integrity concerns. It is also worrying to see a near H2S miss (H2S can be deadly). Also there remains a shortage of staff. Overall it is hard to see production restarting any time soon.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All

Evolution of the Cliffside Helium Reserve

The Cliffside gas field in North Texas, discovered in 1924, has played a pivotal role in helium storage since 1945 when the US government began injecting helium to counteract shortages during wartime

Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page