Renergen drills new gas well and continues plant commissioning
- Jun 29, 2022
- 2 min read
Renergen has bought a new gas blower named Gandalf. Gas was intersected at 480m from surface with a flow rate of around 90 mcf/d. The target depth is 1,200m, so after initial testing the well was cased in preparation to drill to the full depth. At present the drillers are preparing to drill through the cement and further to the target depth, which is anticipated to be complete towards the end of August.
