top of page

NASCO Commences Production at Boundary Butte Field in Utah

  • Jul 28, 2021
  • 2 min read

NASCO Energie & Rohstoff declared that there was flowing gas from the company's Boundary Butte Field in Utah into the Paradox Resources plant at Lisbon, Utah. The gas contains ~1% helium concentration at a 99.999% purity level. The field also has 2 potential deeper gas zones that have already been tested and also contain helium between 1 and 2% of the volume that the company has tested.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
US Energy Set to Finalise Helium Offtake in Q1’26

US Energy achieved several milestones at its Kevin Dome project in Montana. It completed engineering works for a planned processing facility, which is designed to handle 8mmcf/d of raw gas capacity an

 
 
bottom of page