top of page

Imperial Helium confirms sufficient deliverability from its first 2 wells

IHC-Steveville-2 and 3 confirm the deliverability rate of 10-15mmcf/d (~0.44% helium) for >3 years before decline. This gas rate is supported by production test results from the Blow-out Zone (BOZ) in IHC-Steveville-2, which had rates of 5-8mmcf/d, and in IHC-Steveville-3, deliverability estimates from the BOZ combined with production test analysis of the new Sub-Salt Zone of 2.5 mmcf/d.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page