top of page

Imperial Helium begins drilling at IHC-Steveville-3

In a recent press release, Imperial Helium announced that it had begun drilling at its second well on the IHC-Steveville-3 property. The well was spudded on 6th December and the drilling is expected to carry on for 20 days to a total depth of ~1,680 meters. Subsequent to drilling, logging and casing a minimum of two production tests are expected, in multiple zones, over an eight-to ten-week period.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page