top of page

Avanti Energy Confirms Montana Helium Discovery

Avanti Energy has completed an acidisation and and clean-up process of the Flathead Cambrian zone on its WNG 11-22 well, after which the well peaked a flow rate of over 4 mmcf/d for six days. Preliminary lab results of the Cambrian Zone indicate a helium concentration of 1.1% and 97.5% nitrogen. Based on these results, the Company is pursuing a small facility design based on an inlet production rate of 5 mmcf/d of raw gas, resulting in an estimated 55 mcf/d of net helium (~20 liquid ISOs of helium per annum). There are no details on the reserve potential and the size of the structure appears to be fairly small.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page